INSULATING MODULAR SCAFFOLD
Equipment required for interventions in high and extra-high voltage electrical installations, mainly substations.
It provides a condition of access and positioning to the electrician at heights necessary for the most diverse types of bare-hand and hot-stick works. The development of new components has greatly expanded the mounting options for the insulating scaffold. It also allowed compliance with the NR-18 standard requirements (brazilian standard).
Made of lightweight, interchangeable, snap-on parts, assembly is easy, simple, and quick. It can also be performed by only two electricians, without requiring additional tools.
Its structure is made with RITZGLAS® tubes, with electrical and mechanical properties in accordance with the IEC-60855 and ASTM F 711 standards.
So it can be used in energized installations up to 800 kV, ensuring full electrical insulation and a rated working capacity of up to 300 daN (660 lb) at the center of the platform.
01. | Base, Column and Platform: 1.0 x 1.0 m | 02. | Base and Column: 1.0 x 1.0 m Platform: 2.0 x 1.0 m | |
03. | Base and Column: 1.0 x 1.0 m Two Platform: 2.0 x 1.0 m Side Extension: 1.0 m | 04. | Two Column: 1.0 x 1.0 m Platform: 4.0 x 1.0 m | |
05. | Base and Column: 2.0 x 2.0 m Reduced to: 1.0 x 1.0 m Platform: 2.0 x 1.0 m Side Extension: 1.0 m | 06. | Base, Column, and Platform: 2.0 x 2.0 m |
FLV06052-1 1.0 x 1.0 m module with cast aluminum connection made of Ø 38 mm RITZGLAS® tubes. It has non-slip rungs and locking cotter pins Approx. Weight. 7.00 kg | 15.43 lb | ||
FLV09091-1 | ||
FLV13916-1 | ||
FLV16241-1 | ||
FLV16241-2 | ||
FLV16241-3 | ||
FLV16241-4 | ||
FLV16241-5 | ||
FLV17444-1 Platform made of 4 fiberglass planks with non-slip surface, used only for 2.0 x 1.0 m scaffold base assemblies Approx. Weight. 26.40 kg | 58.20 lb | ||
FLV17444-2 | ||
FLV17444-3 | ||
FLV04803-3 Rope insulating stick made with RITZGLAS® tube | ||
RM1895-3 | ||
FLV31343-1 Approx. Weight. 3.50 kg | 7.70 lb | ||
FLV31240-1 Set of 4 scaffolding casters 1.0 x 1.0 m base. Equipped with stabilizing shoes 108.40 238.98 and 2 steel rods for spacing and locking the scaffold base | ||
FLV31240-2 | ||
FLV31240-3 Approx. Weight. 110.60kg | 243.83 lb | ||
FLV31340-1 | ||
FLV31340-2 |
FLV16238-1 | ||
FLV17496-1 | ||
FLV16237-1 | ||
FLV16237-2 | ||
FLV16241-6 | ||
FLV16241-7 | ||
FLV14342-1 | ||
FLV14342-2 | ||
FLV14342-3 |
FLV09012-1 | ||
ESC15051-1 | ||
ESC15051-2 | ||
ESC15051-3 | ||
FLV17648-1 Bracing strap made of cast bronze alloy. They have an hinged eye to couple the rope insulating stick. It is always installed in the scaffolding connections Approx. Weight. 0.40 kg | 0.88 lb | ||
FLV15444-1 | ||
FLV18169-1 | ||
FLV18169-2 | ||
FLV18269-1 | ||
FLV18375-1 | ||
FLV23916-1 | ||
RC402-0288 | ||
MD800 Digital microammeter used for leakage current measurement in scaffolding field electric tests. It has a scale from 0 to 800 µA, supplied with clips, connection cable, a metal frame fixing device and a storage box. Approx. Weight. 3.12 kg | 6.88 lb | ||
ATR30985-1 Temporary jumper for live line operations in substation for connector replacement, consisting of: 2 pç ATR13159-1 - All-around clamp with locking eye screw, in aluminum alloy, connected to the extra flexible copper wire 95mm² (1.5 m) electrolytic copper conductor through smooth and lean and skirted copper terminal for 95mm (RC600-2633) Approx. Weight. 5.76 kg | 12.70 lb |